Pharmaceutical Intermediates shipped to Ukraine
The pharmaceutical intermediates division counts 14,468 products, and each one can be quoted for delivery to Ukraine. Locally, the main users are in agrochemicals & fertilisers, generic pharmaceuticals and metallurgy & steel. Regular consignments go to industrial centres such as Kyiv, Kharkiv and Dnipro. Typical customers for this division are API manufacturers, CDMOs and CMOs and medicinal and discovery chemistry groups.
Supplying pharmaceutical intermediates to Ukraine
By sea, containers and LCL lots take roughly 30–45 days to Odesa and Chornomorsk. Air cargo to Rzeszów, Poland (RZE) + road takes 5–8 days, which suits small and urgent packs. The relevant authority is State Service of Ukraine on Medicines and Drugs Control. Our export desk lines up the COA, GHS SDS and shipping documents to match. Common grades for this division are Key starting material (KSM) specification, Advanced intermediate (customer spec), Building block, ≥95% / ≥98% purity and Chiral (ee specified).
Grades in this division
Pharma compliance in Ukraine
| Authority | State Service of Ukraine on Medicines and Drugs Control |
|---|---|
| Seaports | Odesa, Chornomorsk, Pivdennyi |
| Airports | Rzeszów, Poland (RZE) + road, Warsaw, Poland (WAW) + road |
| Dangerous goods | IMDG by sea, IATA DGR by air |
Ukraine is aligning its chemical rules with EU REACH and CLP through national technical regulations, so importers increasingly expect EU-style GHS labelling and SDS content in Ukrainian. Medicinal substances and APIs are overseen by the State Service on Medicines and Drugs Control, and controlled precursors need licences. Cargo is commonly routed through Polish airports or Romanian ports with onward road or rail, using T1 transit documents through the EU. War-risk insurance terms should be agreed before shipment.
From order to delivery
- 1–2 daysQuote and document set agreed
Price, pack sizes, Incoterm and the paperwork list are confirmed in writing.
- 3–7 daysPacking for export
Stock items are packed in UN-rated drums or cartons. Made-to-order material adds its own lead time.
- 1–3 daysExport clearance at Nhava Sheva or Mundra
Shipping bill filed, dangerous goods declared under IMDG where needed.
- 30–45 daysOcean transit to Odesa
Port-to-port time depends on the vessel schedule and any transhipment.
- 2–5 daysImport clearance
Your broker clears the goods against local rules. Chemical oversight: Ministry of Economy / Ministry of Environmental Protection (Ukrainian chemical-safety & CLP-aligned technical regulations).
Indicative total by sea: 37–62 days
By air: about 9–18 days in total.
Documents for Ukraine
- Commercial Invoice
- Packing List
- Bill of Lading / Air Waybill
- Certificate of Origin
- Certificate of Analysis (COA)
- Safety Data Sheet (16-section GHS)
- Ukrainian-language labelling / SDS where required by the buyer or regulation
- Import licence or permit for controlled precursors where applicable
- Transit/T1 documents when routed through the EU
- Dangerous Goods Declaration (IMDG/IATA) where applicable
Categories in pharmaceutical intermediates
A selection we ship to Ukraine
A rotating sample from the division. Every product in the catalogue can be quoted for this destination.