Solvents (HPLC & GC) for Germany
The solvents (HPLC & GC) division counts 590 products, and each one can be quoted for delivery to Germany. Demand there comes mainly from basic & specialty chemicals, pharmaceuticals & generics and automotive coatings & plastics. Typical delivery points include Ludwigshafen, Leverkusen / Cologne (ChemCologne) and Frankfurt-Höchst. Typical customers for this division are pharma QC and analytical labs, API and intermediate manufacturers and contract research organisations.
Supplying solvents (HPLC & GC) to Germany
Sea freight reaches Hamburg and Bremerhaven in about 24–30 days port to port. Urgent or small lots fly to Frankfurt (FRA) in 3–5 days. Import compliance for this category sits with ECHA (EU REACH & CLP), and we prepare the COA, SDS and commercial documents your broker needs. Common grades for this division are HPLC / gradient grade, LC-MS grade, Spectroscopy (UV/IR) grade and GC / headspace grade.
Grades in this division
Chemical compliance in Germany
| Authority | ECHA (EU REACH & CLP) |
|---|---|
| Seaports | Hamburg, Bremerhaven, Wilhelmshaven |
| Airports | Frankfurt (FRA), Leipzig/Halle (LEJ) |
| Dangerous goods | IMDG by sea, IATA DGR by air |
German imports follow EU REACH and CLP. A substance arriving at 1 tonne or more per year must be registered by the EU importer or by an Only Representative acting for the Indian manufacturer, and labels and SDS must be in German. Medicinal active substances require GMP compliance and an EU written confirmation, with the competent Länder authorities and BfArM overseeing authorised importers. Dangerous goods must be packed and declared under IMDG or IATA DGR, and customs needs the importer's EORI number.
From order to delivery
- 1–2 daysQuote and document set agreed
Price, pack sizes, Incoterm and the paperwork list are confirmed in writing.
- 3–7 daysPacking for export
Stock items are packed in UN-rated drums or cartons. Made-to-order material adds its own lead time.
- 1–3 daysExport clearance at Nhava Sheva or Mundra
Shipping bill filed, dangerous goods declared under IMDG where needed.
- 24–30 daysOcean transit to Hamburg
Port-to-port time depends on the vessel schedule and any transhipment.
- 2–5 daysImport clearance
Your broker clears the goods against local rules. Chemical oversight: ECHA (EU REACH & CLP).
Indicative total by sea: 31–47 days
By air: about 7–15 days in total.
Documents for Germany
- Commercial Invoice
- Packing List
- Bill of Lading / Air Waybill
- Certificate of Origin
- Certificate of Analysis (COA)
- Safety Data Sheet (16-section GHS)
- REACH registration number or OR declaration (substances ≥1 t/yr)
- EU Written Confirmation for API imports (Art. 46b Directive 2001/83/EC)
- Dangerous Goods Declaration (IMDG/IATA) where applicable
- Importer's EORI number
A selection we ship to Germany
A rotating sample from the division. Every product in the catalogue can be quoted for this destination.