Inorganics & Metals for Poland
Buyers in Poland can order any of the 5,293 products in our inorganics & metals division. In Poland the strongest demand is from generic pharmaceuticals, nitrogen fertilisers & caprolactam and petroleum refining & petrochemicals. Typical delivery points include Warsaw, Płock and Tarnów. Typical customers for this division are battery and energy-storage developers, electronics and semiconductor materials teams and glass, ceramics and pigment producers.
Supplying inorganics & metals to Poland
Sea freight reaches Gdańsk and Gdynia in about 28–36 days port to port. Urgent or small lots fly to Warsaw Chopin (WAW) in 3–5 days. Import compliance for this category sits with ECHA (EU REACH & CLP), and we prepare the COA, SDS and commercial documents your broker needs. Common grades for this division are Technical / industrial, AR / ACS, 99.9% (3N) and 99.99% (4N) and higher.
Grades in this division
Chemical compliance in Poland
| Authority | ECHA (EU REACH & CLP) |
|---|---|
| Seaports | Gdańsk, Gdynia, Szczecin–Świnoujście |
| Airports | Warsaw Chopin (WAW), Katowice (KTW) |
| Dangerous goods | IMDG by sea, IATA DGR by air |
Poland applies EU REACH and CLP. The importer or an Only Representative registers substances imported at 1 tonne or more per year and must supply SDS and labels in Polish. API imports need an EU written confirmation or equivalent GMP standing, and importing sites are supervised by the Chief Pharmaceutical Inspectorate (GIF), with URPL handling medicinal product registration. Customs clearance requires the importer's EORI number, and dangerous goods are declared under IMDG or IATA rules.
From order to delivery
- 1–2 daysQuote and document set agreed
Price, pack sizes, Incoterm and the paperwork list are confirmed in writing.
- 3–7 daysPacking for export
Stock items are packed in UN-rated drums or cartons. Made-to-order material adds its own lead time.
- 1–3 daysExport clearance at Nhava Sheva or Mundra
Shipping bill filed, dangerous goods declared under IMDG where needed.
- 28–36 daysOcean transit to Gdańsk
Port-to-port time depends on the vessel schedule and any transhipment.
- 2–5 daysImport clearance
Your broker clears the goods against local rules. Chemical oversight: ECHA (EU REACH & CLP).
Indicative total by sea: 35–53 days
By air: about 7–15 days in total.
Documents for Poland
- Commercial Invoice
- Packing List
- Bill of Lading / Air Waybill
- Certificate of Origin
- Certificate of Analysis (COA)
- Safety Data Sheet (16-section GHS)
- REACH registration number or Only Representative declaration (substances ≥1 t/yr)
- SDS in REACH Annex II format in the local language (supplied to the EU importer)
- EU Written Confirmation for API imports (Art. 46b Directive 2001/83/EC)
- EORI number of the EU importer (customs declaration)
- Dangerous Goods Declaration (IMDG/IATA) where applicable
A selection we ship to Poland
A rotating sample from the division. Every product in the catalogue can be quoted for this destination.